Almaty Power Plant Environmental Renovation
Delivered explosion-proof roof fan systems and supporting accessories for a major coal-to-gas renovation project.
Предпосылки проекта
The owner upgraded the legacy coal-fired system to gas-based operation and required ventilation and safety improvements for critical areas.
Задача проекта
The project required durable explosion-proof ventilation equipment with short lead time and reliable overseas technical coordination.
Предоставленное решение
Shunda supplied explosion-proof roof fans, matching dampers and accessories, and provided technical data packages for on-site commissioning.
Результат
The ventilation system met operation requirements after commissioning and established long-term supply cooperation for follow-up stages.
Информация о проекте
- Регион: Kazakhstan
- Отрасль: Power Generation
- Контракт: RMB 630,000.00