Malaysia
Sabah Qibin Photovoltaic Glass HVAC Project
Provided HVAC equipment package for production line expansion in a photovoltaic glass facility.
Project Background
The production expansion required stricter humidity and temperature control to ensure glass quality and process stability.
Project Challenge
The owner required indoor relative humidity below 40% and stable airflow control in multiple high-load production zones.
Provided Solution
Shunda provided axial fans, explosion-proof fans, fire dampers and louver air outlets with coordinated layout support.
Result
The delivered system maintained stable air environment indicators and supported efficient production startup.
Project Info
- Region: Malaysia
- Industry: Photovoltaic Glass
- Contract: RMB 458,000.00
Quick Inquiry
Tell us your product or project requirements.
Send us your airflow target, installation conditions and project timeline. Our team will recommend suitable models and provide a quotation quickly.