Complete HVAC system installation for a 25-story business center in Moscow.
The building required a centralized HVAC system across 25 floors with varying occupancy patterns.
We designed and installed a zoned system with 12 AHU-500 units and 8 cooling towers with BMS integration.
Energy consumption reduced by 28%. Tenant satisfaction score: 94%. System operational since 2023.